Current Contracts of OAO VNIPIneft as of August 2016 | |||
Company | Scope of Work | Client | |
PAO NK Rosneft | Authority Engineering and Detail Engineering development for PAO NK Rosneft Operational Product Metering System Project (technical client: OOO RN-Nakhodkanefteprodukt) | PAO NK Rosneft | |
Calculation of maximum discharge of gaseous hydrocarbons from process units to offsite flare header and a flowrate of gas to flare utilization. PO documentation development for a closed-type flare. | OAO Slavneft-YANOS | ||
Updating of Construction Method Statement section for AO RNPK Gas Compression Unit & Offsite Flare System Revamping Project | AO RNPK | ||
Detail Engineering documentation development for Visbreaker revamping |
AO RNPK | ||
Detail Engineering development for AO ANKK Diesel Hydrotreating Unit Project | AO Angarskneftekhimproyekt | ||
PAO Gazprom | Detail Engineering development for Integrated Ethane-Ethylene Plant Project at Novourengoiskii Gas Chemical Complex | Linde | |
Supervision for Integrated Ethane-Ethylene Plant Project at Novourengoiskii Gas Chemical Complex | Linde | ||
Follow-on of the construction of Novourengoiskii Gas Chemical Complex Project | OOO NGCC | ||
Preparation of close-out cost-estimate documentation for the Novourengoiskii Gas Chemical Complex Project | OOO PF VIS | ||
Development and technical & economic analysis of technology for matrix oil integrated processing involving maximum recovery of valuable products | PAO Gazprom | ||
Revamping of condensate stabilization unit at Sosnogorsk Gas Processing Plant | OOO Gazprom pererabotka | ||
Revamping of wastewater treatment facilities | OOO Gazprom pererabotka | ||
Revamping of off-site utilities systems at Sosnogorsk Gas Processing Plant | OOO Gazprom pererabotka | ||
Revamping of finished product tank farms and loading systems at Sosnogorsk Gas Processing Plant |
OOO Gazprom pererabotka | ||
PAO Gazprom neft | Authority Engineering and Detail Engineering development for Catalyst Plant Project at Gazprom neft - Omsk Refinery |
PAO Gazprom neft | |
Civil & Structural Detail Engineering development for CORU at AO Gazprom neft - Moscow Refinery | Tecnimont Russia | ||
Development of Feasibility Study for the modernization of MEA treatment unit at Diesel Hydrotreater |
AO Gazprom neft - Moscow Refinery | ||
Engineering and consultancy services to AO Gazprom neft - Moscow Refinery | AO Gazprom neft - Moscow Refinery | ||
Development of general arrangement drawings and details for vacuum column 100 ΠΆ-105 for AO Gazprom neft - Moscow Refinery | VOKENERGOMASH IPTs | ||
Detail Engineering development for replacement of Hydrotreater pumps | AO Gazprom neft - Moscow Refinery | ||
Approval of operating procedures at Gazprom neft - Omsk Refinery | AO Gazprom neft - Omsk Refinery | ||
Detail Engineering development for Catalyst Plant Efficiency Improvement Project at Gazprom neft - Omsk Refinery | AO Gazprom neft - Omsk Refinery | ||
Supervision for Catalyst Plant Efficiency Improvement Project at Gazprom neft - Omsk Refinery | AO Gazprom neft - Omsk Refinery | ||
PAO Tatneft | Detail Engineering and technical follow-on of equipment procurement for off-site facilities, Phase 1.4, AO TANECO | PAO Tatneft | |
Supervision during the construction of AO TANECO facilities | PAO Tatneft | ||
Supervision for AO TANECO heavy coker gas oil hydrotreater project | PAO Tatneft | ||
Detail Engineering development for AO TANECO Heat & Hot Water Unit | PAO Tatneft | ||
Detail Engineering development for domestic wastewater treatment facility with reference to AO TANECO networks | PAO Tatneft | ||
Authority Engineering and Detail Engineering development, technical follow-on of equipment procurement for off-site facilities, AO TANECO CDU/VDU |
PAO Tatneft | ||
Detail Engineering development for a system of conditionally-contaminated LP steam condensate heat recovery for the water demineralization and condensate treatment system with reference to AO TANECO networks | PAO Tatneft | ||
Supervision for AO TANECO project of the construction of integrated hydrocracker and off-site facilities - Start-up Complex 1b, Phase I |
PAO Tatneft | ||
Supervision for Ashalchinskoye Field Development and infrastructure facilities, designed for production of 800 kTA of super viscous oil |
PAO Tatneft | ||
Detail Engineering development for the replacement of gas analyzers of Hydrogen Plant heater for PAO Tatneft | AO TANECO |
||
Authority Engineering and Detail Engineering development, technical follow-on of equipment procurement for PAO Tatneft Hydroconversion Unit | OOO INKO-TEK | ||
Technical follow-on of process equipment manufacturing for PAO Tatneft Hydroconversion Unit |
OOO INKO-TEK | ||
Detail Engineering development and Engineering Services for AO TANECO Heavy Coker Gas Oil Hydrotreater Project | OOO INKO-TEK | ||
Authority Engineering development for Bolshe-Kamenskoye Upheaval Project |
PAO Tatneft | ||
Detail Engineering development for Bolshe-Kamenskoye Upheaval Project at Ashalchinskoye Field |
PAO Tatneft | ||
Authority Engineering for Yuzhno-Ashalchinskoye Upheaval Development Project |
PAO Tatneft | ||
Detail Engineering development for the Severo-Ashalchinskaya Boiler House at Severo-Ashalchinskoye Upheaval Project |
PAO Tatneft | ||
Detail Engineering documentation development for Yuzhno-Ashalchinskoye Upheaval Development Project |
PAO Tatneft | ||
Total | Updating and follow-on of design & cost estimate documentation for Kharyaga Field Development Project | AO Giprovostokneft | |
OOO SIBUR | Consulting services for OOO ZapSibNefteKhim Petrochemical Complex Project | OOO ZapSibNefteKhim | |
Verification of completeness and quality control of construction supervision for OOO ZapSibNefteKhim Petrochemical Complex Project | OOO ZapSibNefteKhim | ||
Preparation of Authority Engineering documentation for OOO ZapSibNefteKhim Petrochemical Complex Project | OOO ZapSibNefteKhim | ||
Updating of geotechnical survey reports for OOO ZapSibNefteKhim Petrochemical Complex | OOO ZapSibNefteKhim | ||
Updating of general and special sections of Authority Engineering documentation for OOO ZapSibNefteKhim Petrochemical Complex | OOO ZapSibNefteKhim | ||
Updating of Authority Engineering for Ethylene Plant at OOO ZapSibNefteKhim Petrochemical Complex | OOO ZapSibNefteKhim | ||
Civil & Structural Steel Detail Engineering documentation for OOO ZapSibNefteKhim Petrochemical Complex Project | Linde | ||
Detail Engineering development for technical reequipment of the isobutane dehydrogenation unit (BK-2) involving its expansion to at least 200 kTA on 100% isobutylene for OOO SIBUR Tobolsk |
OOO SIBUR Tobolsk | ||
AO MKhK Euro-Chem | Detail Engineering documentation development for Kingisepp Ammonia Plant Project - Water Unit |
ZAO Ionnoobmenniie tekhnologii | |
AO NK KMG | Pavlodar Oil Chemistry Refinery Upgrading Project - Authority Engineering | ROMINSERF | |
Technical assistance in preparation of summary specification sheets and acquisition of technical & commercial proposals from potential vendors for POCR SC 2 & 3 | ROMINSERF | ||
Translation of Authority Engineering documentation | ROMINSERF | ||
Adaptation of the existing units of Start-up Complexes 2 & 3 to Standards of the Republic of Kazakhstan in the course of POCR upgrading | ROMINSERF | ||
Kazakhstan Petrochemical Industries Inc. | Pre-project and design activities for updating of the process design section for Feasibility Study and Authority Engineering documentation for Integrated Gas Chemical Complex Project in Atyrau region |
Ekspert Sertifikatsiia | |
Updating of the process design section for Feasibility Study and Authority Engineering documentation for Integrated Gas Chemical Complex Project in Atyrau region |
Kazakhstan Petrochemical Industries Inc. | ||
OAO TAIF | Engineering consultancy services for PAO Nizhnekamskneftekhim Project of a 600-kTA ethylene plant including off-site facilities |
Toyo Engineering Corporation | |
AO Salavatskii NKhZ | Authority Engineering development for Small-Capacity Naphthyl Plant Project at AO Salavatskii NKhZ |
GUP Bashgiproneftekhim | |
Mechanical design of High-Pressure Equipment for Small-Capacity Naphthyl Plant Project at AO Salavatskii NKhZ |
GUP Bashgiproneftekhim | ||
OOO VPK-Oil | Follow-up of Basic Design Acceptance - Diesel Hydrotreating Unit at Kochenevskii Refinery | OOO VPK-Oil | |
Development of Authority Engineering and Detail Engineering for a 300-kTA diesel hydrotreating unit at Kochenevskii Refinery |
OOO VPK-Oil | ||
PAO Novolipetskii Metallurgicheskii Kombinat (PAO NLMK) | Pre-project development: PAO NLMK. Marketing Study "Products of vacuum residue conversion into petroleum coke or petroleum-based additive" | PAO Novolipetskii Metallurgicheskii Kombinat |