Oil Refining
- OAO TatneftHydrocrackingComplex, 2.9 MTA – 2014
OAO VNIPIneft Scope of Work: Authority Engineering,DetailedDesign, Procurement, Supervision.
- ZAO RNPK VGO Hydrocracking Complex,2 MTA – 2014
OAO VNIPIneft Scope of Work: Authority Engineering
- Sulfur Recovery Unit at the MMC Norilsk Nickel Polar Division Copper Plant - 2014
OAOVNIPIneftScopeofWork: AuthorityEngineering
- OOO LUKOIL-Volgogradneftepererabotka Integrated CDU/VDU, 6 MTA - 2014
OAOVNIPIneftScopeofWork: Authority Engineering and Detailed Design
- OAO Gazprom Neft – Moscow Refinery Isomerization Unit, 650 kTA – 2013
OAOVNIPIneftScopeofWork: Basic Design Acceptance, Detailed Design,Supervision
- OAO Gazprom Neft – Moscow Refinery Diesel Hydrotreating Unit, 320 kTA- 2013
OAOVNIPIneftScopeofWork: Authority Engineering and Detailed Design, Supervision
- OOO LUKOIL-Volgogradneftepererabotka Atmospheric – Vacuum Distillation Unit - 2012
OAOVNIPIneftScopeofWork: Authority Engineering
- OAO Angarskneftekhimproyekt Diesel Hydrotreating Unit- 2012
OAOVNIPIneftScopeofWork: Authority Engineering
- OAO Gazprom Neft – Moscow RefineryPSA Unit - 2011
OAOVNIPIneftScopeofWork:Authority Engineering and Detailed Design, Supervision
- OJSC TANECO CDU/VDU, 7 MTA - 2010
OAOVNIPIneftScopeofWork: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision
- OOO PO Kirishinefteorgsintez
Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking) OAOVNIPIneftScopeofWork: Basic Design Acceptance; Detailed Design, Procurement. Commissioningdate: 2009
- ZAO RNPK Deep Conversion Complex
Capacity: 2.5 MTA OAOVNIPIneftScopeofWork: BasicDesignAcceptance, AuthorityEngineeringandDetailedDesign(jointlywithCB&ILummus); Procurement; Supervision. Commissioningdate: 2005-2006
- OAO TAIF-NK Catalytic Cracking Complex
Capacity: 850 kTA OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; BasicDesign(jointly with OAO VNIINP);DetailedDesign; Procurement; Supervision. Commissioningdate: 2005
- OAO Slavneft-Yaroslavnefteorgsintez Deep Conversion Complex
Capacity: 2.1 MTA OAOVNIPIneftScopeofWork: BasicDesignAcceptance, DetailedDesign(jointlywithToyoEngineeringCorporation); Supervision. Commissioningdate: 2005
- OOO LUKOIL-Permnefteorgsintez VGO Hydrocracking Complex
Capacity: 3.5 MTA - Plant OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; Basic Design Acceptance; DetailedDesign, Procurement, Supervision. Commissioning date: 2004
- ZAO RNPK Catalytic Cracking Complex Capacity: 2.5 MTA
OAOVNIPIneftScopeofWork: DetailedDesign, Supervision. Commissioning date: 2001
|
|